MDE e-Permits

Permit Number: MDRCB09WW
State Number: 20CPB09WW

Notice for Stormwater Associated with Construction Activity

Notice of Intent information is shown below.

Stormwater Pollution Prevention Plan » Show » Hide

There are NO Federal or State listed rare, threatened, and endangered species and/or designated critical habitats that are located in the project area.


Option 1. All operators associated with a construction site under this permit must develop a SWPPP consistent with the requirements in Part III.F prior to their submittal of the NOI.


C. I plan on implementing controls associated with the activities requiring pollution prevention measures, referenced in Part III.A.3 of the permit.

  • For equipment and vehicle washing
Erosion and Sediment Control » Show » Hide

Erosion and Sediment Control Plan Approval Authority: Anne Arundel SCD

General Information » Show » Hide

Permit Type: General Permit


Signatory

Professional Title: Senior Project Manager

Name: Mr.  David  Kimble

Organization: Howard Shockey and Sons, Inc.


Address: 1057 Martinsburg Pike, Winchester, Virginia 22603

Mailing Address: 1057 Martinsburg Pike, Winchester, Virginia 22603


Phone: 540-323-1925

Email: dakimble@howardshockey.com


Permittees

Organization Name Email Address Type
Howard Shockey and Sons, Inc. David Kimble dakimble@howardshockey.com Primary

Contact Person

Professional Title: Senior Project Manager

Name: Mr.  David  Kimble

Phone: (540) 323-1925

Email: dakimble@howardshockey.com


Tax Information

Tax Entity: Corporation/LLC


Workers Compensation Coverage

Provider Name: Travelers

Policy/Binder Number: UB-B468103A-25-51-G

Site Information » Show » Hide

Site/Project Name: The Village at Providence Point

Address: Crystal Spring Farm Rd, Annapolis, Maryland 21403

County: Anne Arundel County

Site Coordinates (N, W): 38.96390°,  -76.51682°

Total Site Area: 55.00 acres

Total Disturbed Area: 30.80 acres


Site Contact Person

Professional Title: Senior Project Manager

Name: Mr.  David  Kimble

Phone: (540) 323-1925

Email: dakimble@howardshockey.com

Project Information » Show » Hide

Construction Project

Project Start Date: 10/15/2025

Project End Date: 07/31/2027

Description: The Villages at Providence Point is a residential construction project in the areas north and south of Crystal Spring Farm Road in Annapolis, MD. The property area is approximately 55 acres, with a 30.8 acre limit of disturbance. This project involves the demolition of the existing structures at 1643 Crystal Spring Farm Road, and the construction of an independent living building and 30 single-family homes, as well as associated land development, utilities, and improvements to Spa Road.

Emergency-related project: No

Located within a floodplain: No

Located within a critical area: Yes

Types of Construction: Single-Family Residential, Multifamily Residential, Highway or Road


Discharge Information

Site Runoff: Surface waters -- South River

Watershed Basin Code: 02131003

Does the site fall within a Tier II Watershed? No

Are the receiving waters listed on the current Maryland 303(d) list as impaired? Yes

Cause(s) of the impairment: Bacteria, Nutrients, PCBs, Sediments

Use Class: Use II


Permanent Stormwater Management Facilities

Stormwater management facilities waived or exempted? No

Documents for Upload » Show » Hide
Document Type Document Name / Link Date Modified
Certification of Erosion and Sediment Control Plan Approval GRD 22-0023 - TVPP Civil - Set 1 - cover.pdf 10/20/2025 11:03:02 AM
Vicinity Map SWPPP_Exhibits (9c1e1a2c-011e-4103-8a3c-a3705ea0bfb1).pdf 10/20/2025 11:03:55 AM
Certification » Show » Hide
Full Name Signature Date Person Type Disturbed Acreage
David Kimble 10/20/2025 Primary 30.80
David Kimble 10/20/2025 Primary 30.80
David Kimble 10/20/2025 Primary 30.80
MDE Administrator Comments
Comment Date Reviewed By Reviewer Comment
10/27/2025 j*****h Approved for public notice. Please be advised the receiving waters are impaired for sediment and dewatering activities are subject to turbidity benchmark monitoring requirements under Part III.B.4 of the 20-CP; NOI Question 1.B must be modified if dewatering activities occur.
11/12/2025 j*****h 20-CP coverage granted. Please review the 20-CP (Part II.A.9) ‘Deadlines for Coverage’ regarding new SWPPP triggering activities and additional operators. Any construction activity pollution control measures or monitoring requirements required by MDE LMA or DNR WHS must be included with the SWPPP.