MDE e-Permits

Permit Number: MDRCJ09TB
State Number: 20CPJ09TB

Notice for Stormwater Associated with Construction Activity

Notice of Intent information is shown below.

Stormwater Pollution Prevention Plan » Show » Hide

There are NO Federal or State listed rare, threatened, and endangered species and/or designated critical habitats that are located in the project area.


Option 1. All operators associated with a construction site under this permit must develop a SWPPP consistent with the requirements in Part III.F prior to their submittal of the NOI.


C. I plan on implementing controls associated with the activities requiring pollution prevention measures, referenced in Part III.A.3 of the permit.

  • For storage, handling, and disposal of building products, materials, and wastes
  • For washing applicators and containers used for stucco, paint, concrete, form release oils, curing compounds, or other materials

D. I am a co-permittee/co-operator with one or more operators, but not in a common plan.

Erosion and Sediment Control » Show » Hide

Erosion and Sediment Control Plan Approval Authority: Dorchester SCD

General Information » Show » Hide

Permit Type: General Permit


Signatory

Name: Mr.  Jason  Avramides

Organization: Pfister Energy


Address: 57 Goffle Rd, Hawthorne, New Jersey 07506

Mailing Address: 57 Goffle Rd, Hawthorne, New Jersey 07506


Phone: 2406880837

Email: javramides@pfisterenergy.com


Permittees

Organization Name Email Address Type
Pfister Energy Jason Avramides javramides@pfisterenergy.com Primary

Contact Person

Name: Mr.  Jason  Avramides

Phone: (240) 688-0837

Email: javramides@pfisterenergy.com


Tax Information

Tax Entity: Corporation/LLC

Site Information » Show » Hide

Site/Project Name: Fairview

Address: 3400 Ocean Gateway, East New Market, Maryland 21631

County: Dorchester County

Site Coordinates (N, W): 38.55479°,  -75.98891°

Total Site Area: 40.05 acres

Total Disturbed Area: 19.67 acres


Site Contact Person

Name: Mr.  Adam  Keyser

Phone: (443) 871-1604

Email: akeyser@pfisterenergy.com

Project Information » Show » Hide

Construction Project

Project Start Date: 09/15/2025

Project End Date: 02/27/2026

Description: 3.396 MW DC ground mounted solar farm on existing property

Emergency-related project: No

Located within a floodplain: No

Located within a critical area: No

Types of Construction: Other -- 3674


Discharge Information

Site Runoff: Surface waters -- Transquaking River Watershed

Watershed Basin Code: 02130308

Does the site fall within a Tier II Watershed? No

Are the receiving waters listed on the current Maryland 303(d) list as impaired? Yes

Cause(s) of the impairment: Sediments

Use Class: Use I


Permanent Stormwater Management Facilities

Stormwater management facilities waived or exempted? No

Documents for Upload » Show » Hide
Document Type Document Name / Link Date Modified
Vicinity Map Fairview Vacinity Map.png 9/10/2025 10:49:21 AM
Certification of Erosion and Sediment Control Plan Approval SCP#25-046 CHABERTON FAIRVIEW SOLAR_ APPROV letter.pdf 9/10/2025 11:54:10 AM
Certification » Show » Hide
Full Name Signature Date Person Type Disturbed Acreage
Jason Avramides 9/10/2025 Primary 19.67
MDE Administrator Comments
Comment Date Reviewed By Reviewer Comment
9/17/2025 m**********y Approved for public notice. Be advised the NOI was updated to indicate impairments for the receiving waters which includes sediments; this means dewatering discharges would be subject to turbidity benchmark monitoring requirements under Part III.B.4 of the 20-CP. If dewatering activities occur NOI Question 1.B must be modified and the on-site SWPPP must include turbidity monitoring details.
10/2/2025 j*****h 20-CP coverage granted. Please review the 20-CP (Part II.A.9) ‘Deadlines for Coverage’ regarding new SWPPP triggering activities and additional operators. Any construction activity pollution control measures or monitoring requirements required by MDE LMA or DNR WHS must be included with the SWPPP.