MDE e-Permits

Permit Number: MDRCF09ST
State Number: 20CPF09ST

Notice for Stormwater Associated with Construction Activity

Notice of Intent information is shown below.

Stormwater Pollution Prevention Plan » Show » Hide

There are NO Federal or State listed rare, threatened, and endangered species and/or designated critical habitats that are located in the project area.


Option 1. All operators associated with a construction site under this permit must develop a SWPPP consistent with the requirements in Part III.F prior to their submittal of the NOI.


C. I plan on implementing controls associated with the activities requiring pollution prevention measures, referenced in Part III.A.3 of the permit.

  • For equipment and vehicle fueling and maintenance
  • For storage, handling, and disposal of building products, materials, and wastes
Erosion and Sediment Control » Show » Hide

Erosion and Sediment Control Plan Approval Authority: Caroline SCD

General Information » Show » Hide

Permit Type: General Permit


Signatory

Professional Title: Commissioner President

Name: Mr.  Travis  Breeding

Organization: Caroline County Commissioners Office


Address: 109 Market Street, Suite 123, Denton, Maryland 21629

Mailing Address: 109 Market Street, Suite 123, Denton, Maryland 21629


Phone: 410-479-8100

Email: dfox@carolinemd.org


Permittees

Organization Name Email Address Type
Caroline County Commissioners Office Travis Breeding dfox@carolinemd.org Primary

Contact Person

Name: Ms.  Maria  Brophy

Phone: (410) 822-8003

Email: mbrophy@leinc.com


Tax Information

Tax Entity: Local Facility

Site Information » Show » Hide

Site/Project Name: Double Hills Road Industrial Park

Phase: Phase 1

Address: 9391 Double Hills Road, Denton, Maryland 21629

County: Caroline County

Site Coordinates (N, W): 38.86531°,  -75.82249°

Total Site Area: 76.31 acres

Total Disturbed Area: 5.43 acres


Site Contact Person

Name: Mr.  David  Edwards

Phone: (410) 479-0520

Email: dedwards@carolinemd.org

Project Information » Show » Hide

Construction Project

Project Start Date: Unspecified

Project End Date: Unspecified

Description: Proposed subdivision of current parcel into an industrial park consisting of 7 initial lots, 4 open space lots, 2 public road right-of-ways, and the construction of a public road.

Emergency-related project: No

Located within a floodplain: No

Located within a critical area: No

Types of Construction: Industrial and Warehouses


Discharge Information

Site Runoff: Surface waters -- Choptank River

Watershed Basin Code: 02130404

Does the site fall within a Tier II Watershed? Yes

Are the receiving waters listed on the current Maryland 303(d) list as impaired? Yes

Cause(s) of the impairment: Nutrients, PFOS, Sediments

Use Class: Use II


Permanent Stormwater Management Facilities

Stormwater management facilities waived or exempted? No

Documents for Upload » Show » Hide
Document Type Document Name / Link Date Modified
Tier II Watershed Supporting Documentation DoubleHillsRdIndustrialParkCarolineCounty_TierII_Letter.pdf 9/4/2025 10:07:25 AM
Vicinity Map Vicinity Map.png 9/3/2025 12:44:39 PM
Certification of Erosion and Sediment Control Plan Approval 2025-07-18-Subdivision Construction Plans.pdf 9/4/2025 9:56:02 AM
Certification » Show » Hide
Full Name Signature Date Person Type Disturbed Acreage
Travis Breeding 9/4/2025 Primary 5.43
MDE Administrator Comments
Comment Date Reviewed By Reviewer Comment
9/5/2025 m**********y Approved for public notice. NOI has been updated to indicate Use II. Be advised dewatering activities would be subject to turbidity benchmark monitoring requirements under Part III.B.4 of the 20-CP as the project’s receiving waters are impaired for sediments - if dewatering discharges occur NOI Question 1.B must be modified and the on-site SWPPP must include turbidity monitoring details. Response to NOI Question 1.D must be updated if multiple operators will be sharing permit-related responsibilities for this project - all operators must obtain 20-CP permit coverage prior to earth disturbing activities.
9/22/2025 m**********y 20-CP coverage granted. The receiving waters are impaired for sediments and dewatering effluent would be subject to turbidity benchmark monitoring requirements under Part III.B.4 of the 20-CP - if dewatering discharges occur NOI Question 1.B must be modified and the on-site SWPPP must include turbidity monitoring details. Please review the 20-CP (Part II.A.9) ‘Deadlines for Coverage’ regarding new SWPPP triggering activities and additional operators - all operators must obtain 20-CP permit coverage prior to earth disturbing activities. Any construction activity pollution control measures or monitoring requirements required by MDE LMA or DNR WHS must be included with the SWPPP.