MDE e-Permits

Permit Number: MDRCD09V9
State Number: 20CPD09V9

Notice for Stormwater Associated with Construction Activity

Notice of Intent information is shown below.

Stormwater Pollution Prevention Plan » Show » Hide

There are NO Federal or State listed rare, threatened, and endangered species and/or designated critical habitats that are located in the project area.


Option 1. All operators associated with a construction site under this permit must develop a SWPPP consistent with the requirements in Part III.F prior to their submittal of the NOI.


C. I plan on implementing controls associated with the activities requiring pollution prevention measures, referenced in Part III.A.3 of the permit.

  • For equipment and vehicle fueling and maintenance
  • For equipment and vehicle washing
  • For storage, handling, and disposal of building products, materials, and wastes

D. I am a co-permittee/co-operator with one or more operators, but not in a common plan.

Erosion and Sediment Control » Show » Hide

Erosion and Sediment Control Plan Approval Authority: Baltimore City

Plan ID Number: BCNR-11731

General Information » Show » Hide

Permit Type: General Permit


Signatory

Professional Title: Superintendent/CEO

Name: Mr.  Rob  Hair

Organization: Maryland School for the Blind


Address: 3501 Taylor Avenue, baltimore, Maryland 21236

Mailing Address: 3501 Taylor Avenue, baltimore, Maryland 21236


Phone: 410-444-5000

Email: robh@mdschblind.org


Permittees

Organization Name Email Address Type
Maryland School for the Blind Rob Hair robh@mdschblind.org Primary

Contact Person

Professional Title: Superintendent/CEO

Name: Mr.  Rob   Hair

Phone: (410) 444-5000

Email: robh@mdschblind.org


Tax Information

Tax Entity: Corporation/LLC

Site Information » Show » Hide

Site/Project Name: MSB Pool & Gym

Phase: 2

Location Description: Construction of pool/gym building and associated hardscape areas. Demolition of existing gym building and construction of a pavilion

Address: 3501 Taylor Avenue, Baltimore, Maryland 21236

County: Baltimore City

Site Coordinates (N, W): 39.36359°,  -76.53441°

Total Site Area: 93.10 acres

Total Disturbed Area: 4.39 acres


Site Contact Person

Professional Title: Superintendent/CEO

Name: Mr.  Rob   Hair

Phone: (410) 444-5000

Email: robh@mdschblind.org

Project Information » Show » Hide

Construction Project

Project Start Date: 07/01/2025

Project End Date: 12/31/2028

Description: Demolition and reconstruction of gym and associated hardscape areas.

Emergency-related project: No

Located within a floodplain: No

Located within a critical area: No

Types of Construction: Other Non-residential Construction


Discharge Information

Site Runoff: Surface waters -- 02130901 Stemmers Run - Back River

Watershed Basin Code: 02130901

Does the site fall within a Tier II Watershed? No

Are the receiving waters listed on the current Maryland 303(d) list as impaired? Yes

Cause(s) of the impairment: Ions, Sediments, Stream Modification

Use Class: Use IV


Permanent Stormwater Management Facilities

Stormwater management facilities waived or exempted? No

Documents for Upload » Show » Hide
Document Type Document Name / Link Date Modified
Vicinity Map Vicinity Map2.pdf 6/18/2025 4:55:32 PM
Certification of Erosion and Sediment Control Plan Approval BCNR-11731 MSB P&G SWM-ESC Approved Cover Sheet.pdf 9/30/2025 11:40:01 AM
Certification » Show » Hide
Full Name Signature Date Person Type Disturbed Acreage
W. Robert Hair 10/2/2025 Primary 4.39
W. Robert Hair, Superintendent CEO 10/1/2025 Primary 4.39
MDE Administrator Comments
Comment Date Reviewed By Reviewer Comment
10/2/2025 m**********y The NOI lists the total disturbed area as 4.91 acres, however the provided ESC plan coversheet lists the disturbed area as 4.397 acres - please adjust NOI to be consistent with the approved ESC plans. The NOI should also be updated to provide a department ID for the listed permittee organization - this can be found using MD's Business Entity Search (https://egov.maryland.gov/BusinessExpress/EntitySearch). Once all corrections have been made, resubmit NOI for review/approval.
10/2/2025 m**********y Approved for public notice. Be advised dewatering activities would be subject to turbidity benchmark monitoring requirements under Part III.B.4 of the 20-CP as the project’s receiving waters are impaired for sediments - if dewatering discharges occur NOI Question 1.B must be modified and the on-site SWPPP must include turbidity monitoring details. Response to NOI Question 1.E was adjusted to "No", as this project is not exempt from ESC requirements.
10/17/2025 j*****h 20-CP coverage granted. Please review the 20-CP (Part II.A.9) ‘Deadlines for Coverage’ regarding new SWPPP triggering activities and additional operators. Any construction activity pollution control measures or monitoring requirements required by MDE LMA or DNR WHS must be included with the SWPPP.