MDE e-Permits

Permit Number: MDRCN09UY
State Number: 20CPN09UY

Notice for Stormwater Associated with Construction Activity

Notice of Intent information is shown below.

Stormwater Pollution Prevention Plan » Show » Hide

There are NO Federal or State listed rare, threatened, and endangered species and/or designated critical habitats that are located in the project area.


Option 1. All operators associated with a construction site under this permit must develop a SWPPP consistent with the requirements in Part III.F prior to their submittal of the NOI.


C. I plan on implementing controls associated with the activities requiring pollution prevention measures, referenced in Part III.A.3 of the permit.

  • For equipment and vehicle fueling and maintenance
  • For equipment and vehicle washing
  • For storage, handling, and disposal of building products, materials, and wastes
  • For the application of fertilizers
Erosion and Sediment Control » Show » Hide

Erosion and Sediment Control Plan Approval Authority: Howard SCD

Plan ID Number: EP-24-15

General Information » Show » Hide

Permit Type: General Permit


Signatory

Professional Title: Project Manager

Name: Mr.  Sanjay  Kulkarni

Organization: Howard County DPW


Address: 8250 Old Montgomery RD, Columbia, Maryland 21045

Mailing Address: 8250 Old Montgomery RD, Columbia, Maryland 21045


Phone: 410-313-6122

Email: SKulkarni@howardcountymd.gov


Permittees

Organization Name Email Address Type
Howard County DPW Sanjay Kulkarni SKulkarni@howardcountymd.gov Primary

Contact Person

Professional Title: Vice President

Name: Mr.  Will   Hinz

Phone: (443) 286-6311

Email: whinz@wrallp.com


Tax Information

Tax Entity: Local Facility

Site Information » Show » Hide

Site/Project Name: Old Frederick Road Pump Station Downstream Sewer Improvements

Location Description: Crossing at I-70 and Orchard Avenue

Address: Ellicott City, Maryland 21043

County: Howard County

Site Coordinates (N, W): 39.29939°,  -76.81862°

Total Site Area: 2.70 acres

Total Disturbed Area: 2.70 acres


Site Contact Person

Professional Title: Project Manager

Name: Mr.  Sanjay  Kulkarni

Phone: (410) 313-6122

Email: SKulkarni@howardcountymd.gov

Project Information » Show » Hide

Construction Project

Project Start Date: 02/01/2026

Project End Date: 07/31/2026

Description: The Old Frederick Road Pump Station Downstream Sewer Improvements at Orchard Road and I-70 Crossing will provide an increased sewer capacity to area north of US 70 into the existing County sewer system.

Emergency-related project: No

Located within a floodplain: No

Located within a critical area: No

Types of Construction: Highway or Road, Water, Sewer, or other Pipeline


Discharge Information

Site Runoff: Surface waters -- Sucker Branch

Watershed Basin Code: 02130906

Does the site fall within a Tier II Watershed? No

Are the receiving waters listed on the current Maryland 303(d) list as impaired? Yes

Cause(s) of the impairment: Ions, Sediments, Stream Modification

Use Class: Use I


Permanent Stormwater Management Facilities

Stormwater management facilities waived or exempted? Exempted

Documents for Upload » Show » Hide
Document Type Document Name / Link Date Modified
Certification of Erosion and Sediment Control Plan Approval ep24015c.pdf 9/26/2025 4:16:27 PM
Vicinity Map Vicinity Map.png 9/26/2025 5:12:12 PM
Certification » Show » Hide
Full Name Signature Date Person Type Disturbed Acreage
Sanjay Kulkarni 9/29/2025 Primary 2.70
MDE Administrator Comments
Comment Date Reviewed By Reviewer Comment
10/1/2025 m**********y Approved for public notice. Be advised dewatering activities would be subject to turbidity benchmark monitoring requirements under Part III.B.4 of the 20-CP as the project’s receiving waters are impaired for sediments - if dewatering discharges occur NOI Question 1.B must be modified and the on-site SWPPP must include turbidity monitoring details. NOI Question 1.D must be updated if there will be multiple operators at this project - all operators must obtain 20-CP permit coverage prior to earth disturbing activities. The on-site SWPPP must be updated accordingly upon selection of a contractor.
10/16/2025 j*****h 20-CP coverage granted. Please review the 20-CP (Part II.A.9) ‘Deadlines for Coverage’ regarding new SWPPP triggering activities and additional operators. Any construction activity pollution control measures or monitoring requirements required by MDE LMA or DNR WHS must be included with the SWPPP.