MDE e-Permits

Permit Number: MDRCH09VE
State Number: 20CPH09VE

Notice for Stormwater Associated with Construction Activity

Notice of Intent information is shown below.

Stormwater Pollution Prevention Plan » Show » Hide

There are NO Federal or State listed rare, threatened, and endangered species and/or designated critical habitats that are located in the project area.


Option 2. This Project does not have any of the conditions in 1a - 1e.

Erosion and Sediment Control » Show » Hide

Erosion and Sediment Control Plan Approval Authority: Cecil SCD

General Information » Show » Hide

Permit Type: General Permit


Signatory

Professional Title: Vice President/COO

Name: Mr.  Ryan  Janney


Address: 17 Shea Way, Newark, Delaware 19713

Mailing Address: 17 Shea Way, Newark, Delaware 19713


Phone: 302.533.6858

Email: ryan@asiwaste.com


Permittees

Organization Name Email Address Type
Ryan Janney ryan@asiwaste.com Primary

Contact Person

Professional Title: Vice President/COO

Name: Mr.  Ryan  Janney

Phone: (302) 533-6858

Email: ryan@asiwaste.com


Tax Information

Tax Entity: Individual

Site Information » Show » Hide

Site/Project Name: 329 W. Main Street

Address: 329 West Main Street, Elkton, Maryland 21921

County: Cecil County

Site Coordinates (N, W): 39.6066°,  -75.84167°

Total Site Area: 5.69 acres

Total Disturbed Area: 1.51 acres


Site Contact Person

Professional Title: Vice President/COO

Name: Mr.  Ryan  Janney

Phone: (302) 533-6858

Email: ryan@asiwaste.com

Project Information » Show » Hide

Construction Project

Project Start Date: 11/01/2025

Project End Date: 10/01/2027

Description: Construction of a new warehouse and office building on an existing mostly vacant but previously developed industrial site.

Emergency-related project: No

Located within a floodplain: No

Located within a critical area: No

Types of Construction: Industrial and Warehouses


Discharge Information

Site Runoff: A municipal separate storm sewer system -- Town of Elkton Storm Drain, Little Elk Creek

Watershed Basin Code: 02130605

Does the site fall within a Tier II Watershed? No

Are the receiving waters listed on the current Maryland 303(d) list as impaired? Yes

Cause(s) of the impairment: Biological, Nutrients, Sediments

Use Class: Use II


Permanent Stormwater Management Facilities

Stormwater management facilities waived or exempted? No

Documents for Upload » Show » Hide
Document Type Document Name / Link Date Modified
Vicinity Map vmap.pdf 9/23/2025 4:55:23 PM
Certification of Erosion and Sediment Control Plan Approval F-ESD-1.pdf 9/23/2025 4:55:41 PM
Certification » Show » Hide
Full Name Signature Date Person Type Disturbed Acreage
Ryan M Janney 10/29/2025 Primary 1.51
Ryan M. Janney 10/1/2025 Primary 1.51
MDE Administrator Comments
Comment Date Reviewed By Reviewer Comment
10/2/2025 j*****h The owner appears to be a 'Corporation/LLC' rather than an 'Individual' as entered. Please change the 'ownership' field and enter the Organization Name and Department ID on the NOI accordingly. Please also include all of the impairments for the receiving water under the 'Discharge Information' section - select 'Nutrients' and 'Sediment' from the drop down menu. After making changes please recertify and resubmit the NOI. Thank you.
10/31/2025 j*****h Approved for public notice. Please be advised the project is located on the former site of 'Air Products & Chemicals Inc', a plastic fabrication company. Only uncontaminated water is authorized to discharge under the 20-CP General Permit - contaminated groundwater or contact stormwater that may be contaminated is prohibited.
11/17/2025 m**********y 20-CP coverage granted. The receiving waters are impaired for sediments and dewatering effluent would be subject to turbidity benchmark monitoring requirements under Part III.B.4 of the 20-CP - if dewatering discharges occur NOI Question 1.B must be modified and this project would require a SWPPP. Please review the 20-CP (Part II.A.9) ‘Deadlines for Coverage’ regarding new SWPPP triggering activities and additional operators - all operators must obtain 20-CP permit coverage prior to earth disturbing activities. Any construction activity pollution control measures or monitoring requirements required by MDE LMA or DNR WHS must be included with the SWPPP.