MDE e-Permits

Permit Number: MDRCX09UO
State Number: 20CPX09UO

Notice for Stormwater Associated with Construction Activity

Notice of Intent information is shown below.

Stormwater Pollution Prevention Plan » Show » Hide

There are NO Federal or State listed rare, threatened, and endangered species and/or designated critical habitats that are located in the project area.


Option 1. All operators associated with a construction site under this permit must develop a SWPPP consistent with the requirements in Part III.F prior to their submittal of the NOI.


C. I plan on implementing controls associated with the activities requiring pollution prevention measures, referenced in Part III.A.3 of the permit.

  • For equipment and vehicle fueling and maintenance
  • For storage, handling, and disposal of building products, materials, and wastes
  • For the application of fertilizers

D. I am a co-permittee/co-operator with one or more operators, but not in a common plan.

Erosion and Sediment Control » Show » Hide

Erosion and Sediment Control Plan Approval Authority: Worcester SCD

General Information » Show » Hide

Permit Type: General Permit


Signatory

Professional Title: President

Name: Mr.  Paul C.  Bramble

Organization: David A. Bramble Inc.


Address: 705 Morgnec Road, Chestertown, Maryland 21620

Mailing Address: 705 Morgnec Road, Chestertown, Maryland 21620


Phone: 410-490-1205

Email: pbramble@davidabrambleinc.com


Permittees

Organization Name Email Address Type
David A. Bramble Inc. Paul C. Bramble pbramble@davidabrambleinc.com Primary

Contact Person

Professional Title: Superintendent

Name: Mr.  Bobby  Bramble, Jr.

Phone: (410) 310-8869

Email: bbramblejr@davidabrambleinc.com


Tax Information

Tax Entity: Corporation/LLC

Site Information » Show » Hide

Site/Project Name: OXB Relocate Taxiway A: Package 1

Phase: Package 1

Location Description: Airport Property

Address: 12724 Airport Road, Berlin, Maryland 21811, Berlin, Maryland 21811

County: Worcester County

Site Coordinates (N, W): 38.31036°,  -75.11818°

Total Site Area: 632.00 acres

Total Disturbed Area: 26.00 acres


Site Contact Person

Professional Title: Superintendent

Name: Mr.  Bobby  Bramble, Jr.

Phone: (410) 310-8869

Email: bbramblejr@davidabrambleinc.com

Project Information » Show » Hide

Construction Project

Project Start Date: 10/06/2025

Project End Date: 12/31/2026

Description: The scope of work for this project includes demolition of existing taxiways, earthwork, drainage, construction of new taxiways, soil cement, aggregate base, underdrain, asphalt paving, pavement marking, lighting and guidance signage, utilities, runway pavement maintenance crack sealing and seal coat, topsoiling, seeding, and gravel roadways.

Emergency-related project: No

Located within a floodplain: Yes

Located within a critical area: Yes

Types of Construction: Highway or Road


Discharge Information

Site Runoff: Surface waters -- Unnamed tributary to Sinepuxent Bay

Watershed Basin Code: 02130104

Does the site fall within a Tier II Watershed? No

Are the receiving waters listed on the current Maryland 303(d) list as impaired? Yes

Cause(s) of the impairment: Nutrients

Use Class: Use I


Permanent Stormwater Management Facilities

Stormwater management facilities waived or exempted? No

Documents for Upload » Show » Hide
Document Type Document Name / Link Date Modified
Vicinity Map OBX Vicinity Map.png 9/23/2025 11:09:36 AM
Certification of Erosion and Sediment Control Plan Approval OXB ESC and SWM Approval.pdf 9/23/2025 11:11:48 AM
Certification » Show » Hide
Full Name Signature Date Person Type Disturbed Acreage
Paul C. Bramble 9/25/2025 Primary 26.00
Paul C. Bramble 9/24/2025 Primary 26.00
MDE Administrator Comments
Comment Date Reviewed By Reviewer Comment
9/26/2025 m**********y Approved for public notice. Be advised, the NOI has been updated to indicate that this project is also within a floodplain (as indicated in the other NOI for this project, 20CPX09TC) and that receiving waters are Use I.
10/14/2025 m**********y 20-CP coverage granted. Please review the 20-CP (Part II.A.9) ‘Deadlines for Coverage’ regarding new SWPPP triggering activities and additional operators - all operators must obtain 20-CP permit coverage prior to earth disturbing activities. Any construction activity pollution control measures or monitoring requirements required by MDE LMA or DNR WHS must be included with the SWPPP.