MDE e-Permits

Permit Number: MDRCBF0D4
State Number: 20CPBF0D4

Notice for Stormwater Associated with Construction Activity

Notice of Intent information is shown below.

Stormwater Pollution Prevention Plan » Show » Hide

There are NO Federal or State listed rare, threatened, and endangered species and/or designated critical habitats that are located in the project area.


Option 1. All operators associated with a construction site under this permit must develop a SWPPP consistent with the requirements in Part III.F prior to their submittal of the NOI.


C. I plan on implementing controls associated with the activities requiring pollution prevention measures, referenced in Part III.A.3 of the permit.

  • For equipment and vehicle washing
Erosion and Sediment Control » Show » Hide

Erosion and Sediment Control Plan Approval Authority: Anne Arundel SCD

General Information » Show » Hide

Permit Type: General Permit


Signatory

Professional Title: Director of Facilities Repair

Name:   Daniela  De Rossi

Organization: United States Postal Service


Address: 2200 NW 72 Avenue Ste 228, Miami, Florida 33152

Mailing Address: 2200 NW 72 Avenue Ste 228, Miami, Florida 33152


Phone: 305-470-0807

Email: daniela.derossi@usps.gov


Permittees

Organization Name Email Address Type
United States Postal Service Daniela De Rossi daniela.derossi@usps.gov Primary

Contact Person

Professional Title: Civil Engineer

Name: Mr.  Ian  Tanner

Phone: (330) 564-2308

Email: itanner@gpdgroup.com


Tax Information

Tax Entity: Federal Facility

Site Information » Show » Hide

Site/Project Name: USPS Facility - Severna Park

Address: 21 Magothy Bridge Road, Severna Park, Maryland 21146

County: Anne Arundel County

Site Coordinates (N, W): 39.0994°,  -76.5603°

Total Site Area: 7.84 acres

Total Disturbed Area: 1.09 acres


Site Contact Person

Professional Title: Civil Engineer

Name: Mr.  Ian  Tanner

Phone: (330) 564-2308

Email: itanner@gpdgroup.com

Project Information » Show » Hide

Construction Project

Project Start Date: 04/01/2025

Project End Date: 10/31/2025

Description: Existing and Proposed land uses are for a USPs facility. Construction is to transition the site into EV vehicle use.

Emergency-related project: No

Located within a floodplain: No

Located within a critical area: No

Types of Construction: Commercial


Discharge Information

Site Runoff: Surface waters -- Magothy River

Watershed Basin Code: 02131001

Does the site fall within a Tier II Watershed? No

Are the receiving waters listed on the current Maryland 303(d) list as impaired? Yes

Cause(s) of the impairment: Biological, Nutrients, PCBs, Sediments

Use Class: Use II


Permanent Stormwater Management Facilities

Stormwater management facilities waived or exempted? Exempted

Documents for Upload » Show » Hide
Document Type Document Name / Link Date Modified
Vicinity Map Title Sheet.pdf 7/16/2025 2:16:11 PM
Certification of Erosion and Sediment Control Plan Approval Severna Park_MD USPS Letter of Intent.pdf 7/16/2025 2:36:13 PM
Certification » Show » Hide
Full Name Signature Date Person Type Disturbed Acreage
Daniela De Rossi 9/5/2025 Primary 1.09
Daniela De Rossi 7/21/2025 Primary 1.09
MDE Administrator Comments
Comment Date Reviewed By Reviewer Comment
8/28/2025 m**********y Response to NOI Question 1.C indicates that there will be activities at this project that would require a SWPPP. Please review the SWPPP requirements in Part III.F.1 of the 20-CP permit - if this project would require a SWPPP then one must be attached to the NOI. If there are no SWPPP triggering activities at this project then the response to Question 1.C should be updated accordingly. A template SWPPP is available on MDE's 20-CP webpage (https://mde.maryland.gov/programs/water/wwp/Pages/gp_construction.aspx). Once all corrections have been made, resubmit NOI for approval. Thank you.
9/5/2025 m**********y Approved for public notice. Be advised the NOI was updated to indicate impairments for the receiving waters which includes sediments; this means dewatering discharges would be subject to turbidity benchmark monitoring requirements under Part III.B.4 of the 20-CP. If dewatering activities occur NOI Question 1.B must be modified and the on-site SWPPP must include turbidity monitoring details.
9/22/2025 m**********y 20-CP coverage granted. The receiving waters are impaired for sediments and dewatering effluent would be subject to turbidity benchmark monitoring requirements under Part III.B.4 of the 20-CP - if dewatering discharges occur NOI Question 1.B must be modified and the on-site SWPPP must include turbidity monitoring details. Please review the 20-CP (Part II.A.9) ‘Deadlines for Coverage’ regarding new SWPPP triggering activities and additional operators - all operators must obtain 20-CP permit coverage prior to earth disturbing activities. Any construction activity pollution control measures or monitoring requirements required by MDE LMA or DNR WHS must be included with the SWPPP.