MDE e-Permits

Logged in as: [Name]
Permit Reference Number: MDRCB0001

Summary

Below is a summary of the information provided for this permit. Click ‘Show Information’ for each section to view. If you need to make any modifications, click the appropriate ‘Edit’ button.

Note: If the acreage of the project is increased, you will be required to re-certify and submit. Fees apply.

Erosion and Sediment Control » Show » Hide

Erosion and Sediment Control Plan Approval Authority: Baltimore City

State/Federal project without an SF number? No

General Information » Show » Hide

Permit Type: General


Responsible Person

Title: CEO

Name: Mr. Noah Rogers

Organization: FF Construction, Inc.


Address: 4 Wheel Drive, Annapolis, MD 20401

Mailing Address: P.O. Box 125, Annapolis, MD 20401


Phone: 240-205-3674

Email: noah@email.com


Contact Person

Title: Chief Construction Engineer

Name: Mr. Felix Fixit

Phone: 240-388-2098

Email: felix@email.com


Tax Information

Tax Entity: Local Facility

Federal Tax ID Number: ID-2345098


Workers Compensation Coverage

Provider Name: Rock Bottom Insurance

Policy/Binder Number: 43563456

Site Information » Show » Hide

Site/Project Name: Tower Ash

Phase: 2

Location Description: [Description]

Address: Baltimore, Baltimore City, MD 21202

Site Coordinates: 39.2833° N, 76.6167° W

Total Site Area: 187 acres

Total Disturbed Area: 35 acres


Site Contact Person

Title: Chief Construction Engineer

Name: Mr. Felix Fixit

Phone: 240-388-2098

Email: felix@email.com

Project Information » Show » Hide

Construction Project

Description: [Description]

Permit for Stormwater: 07PG1234

NPDES Number: 23450098

Type of Discharge: [Discharge Type]

Project Type: Private

Project Use: Commercial

SIC Number: 1623 Water, Sewer, Pipeline


Erosion and Sediment Control

Erosion and Sediment Control Plan Approval Authority: [Name]

State/Federal project without an SF number?: No


Discharge Information

Site Runoff: A municipal separate storm sewer system

Watershed Basin Code: Baltimore Harbor (02130903)

Are the receiving waters listed on the current Maryland 303(d) list as impaired? No

Cause of the impairment: Total Suspended Solids, Sedimentation/Siltation

Date comparing the eventual receiving waters with the Maryland 303(d) list: 03/25/2013


Impervious Surface and Runoff Curves

Runoff Curve: [Number]

Pre-Development: [Number]

Post Development: [Number]

Impervious Surface Area: 34 acres


Permanent Stormwater Management Facilities

Stormwater management facilities waived or exempted? No

Facility to be implemented: 2 infiltration trenches, 20 acres total drainage area

Facility to be implemented: 3 retention ponds, 4 acres total drainage area

Facility to be implemented: 1 wetland/shallow marsh, 10 acres total drainage area

Documents for Upload » Show » Hide

Certificate of Compliance: wcc_certCompliance.jpg

Vicinity Map: baltimore_map.pdf